Loading presentation...

Present Remotely

Send the link below via email or IM

Copy

Present to your audience

Start remote presentation

  • Invited audience members will follow you as you navigate and present
  • People invited to a presentation do not need a Prezi account
  • This link expires 10 minutes after you close the presentation
  • A maximum of 30 users can follow your presentation
  • Learn more about this feature in our knowledge base article

Do you really want to delete this prezi?

Neither you, nor the coeditors you shared it with will be able to recover it again.

DeleteCancel

Make your likes visible on Facebook?

Connect your Facebook account to Prezi and let your likes appear on your timeline.
You can change this under Settings & Account at any time.

No, thanks

Obra: Construccion de ambulatorio tipo I

Comunidad El Morenal Tigre de Caicagua, Parroquia Mucurita
by

Anle Zambrano

on 6 February 2013

Comments (0)

Please log in to add your comment.

Report abuse

Transcript of Obra: Construccion de ambulatorio tipo I

Acero de refuerzo Anexos Computos Metricos Presupuesto Memoria Descriptiva Ambulatorio trigra de Achagua Obras Preliminares OBRA: Transporte

Transporte no urbano en camiones y de
maquinaria pesada.

Total: 23794 M3xKm
6342 TonxKm Obras de Servicio El objetivo principal de este proyecto, es la construcción de un nuevo Ambulatorio Rural Tipo I en la población de caicagua, teniendo como fin mejorar la salud de todos los habitantes de dicha población y sus zonas aledañas. Especificaciones y Normas Estructuras Metálicas CONSTRUCCION DE AMBULATORIO TIPO I. COMUNIDAD EL MORENAL TIGRA DE CAICAGUA,PARROQUIA MURITA, MUNICIPIO ACHAGUA EDO APURE. Resources Estructura del Ambulatorio -Fundaciones, pedestales y vigas de riostra de concreto armado
-Estructura metálica conduven en columnas 120x120mm, vigas de carga 160x70mm, y correas de acero 100x40mm
-Cubierta de techo de madera machihembrada, impermeabilizada con manto sintético y recubrimiento de teja criolla de arcilla.
-La tabiquería externa será de bloque de arcilla tipo trincote obra limpia en las fachadas posterior y laterales y frisados acabado a esponja en fachada frontal, ventanas basculantes de hierro y vidrio.
-La tabiquería interna será de bloque de arcilla frisado acabado liso, recubrimiento de porcelana a una altura de 2,10 en toda el área interna.
El ambulatorio contara además con las siguientes instalaciones:
-Instalaciones de aguas claras
-Instalaciones de aguas servidas
-Instalaciones eléctricas para alumbrado y fuerza Ubicación Caserio caicagua del Municipio Muñoz del Estado Apura Sitio de Trabajo Apto para operar de tal forma que sea aprobado por una inspección SOL (Seguridad, Orden y Limpieza) Materiales y Equipos Medición de Partidas Las normas de medición contempladas en las presentes especificaciones se aplicaran para medir el avance de la obra de cada partida y determinar el monto de las valuaciones parciales y totales de la obra ejecutada. Porcentaje de Administración Contemplado -Costos de movilización y desmovilización.
-Costos relativos a finanzas, seguros, impuestos municipales, financiamientos, entre otros.
-Costos de alojamiento, viáticos y transporte del personal.
-Gastos de oficinas
-Imprevistos, bonos, otros gastos. Ingeniero Residente - Planificador (Civil-Colegiado) El cual estará adscrito a la obra y se encargara de la planificación y el avance de la misma. Supervisor de Seguridad Debe estar adscrito a tiempo completo para dicha actividad Tiempo de Ejecución de la Obra 180 días de calendario y contara con 2 fuentes de trabajo Regimen Laboral El contrato se regirá por la Cámara de la Constitución Venezolana - Construcción de un ambulatorio provisional
- Limpieza de un nuevo terreno
- Transporte del material
- Construcción de base con material de relleno de diferente espesores Total: 2003.42 M2
293 M3 Obras de Concreto

Construcción de aceras, cunetas, tanques acabados corrientes con concreto Fc: 180Kg/cm2
Bases, escalone, vigas de riostra, tirantes tirantes, base de pavimento acabados de mantenimiento con concreto
Fc: 210 Kg/ cm2 y Fc: 220 Kg/cm2

Total 47.59 M3 Suministro, transporte,preparación,reparación y colocación de Fy: 4200 Kgf/cm2 Para estructura No 3, No 4, No 7.

Para infraestructura
Malla TRUCKSON 4X4, 6X6

Total: 2018,92 KgF Estructura Metálicas

Suministro, transporte,
confección y colocación

Total: 3496,75 Kgf Encofrados

Tipo recto, acabados corrientes
en bases y escalones

Total: 44.51 M2 Piezas Sanitarias
Suministro, transporte y colocación de
fregaderos, WC, Ducha, toallera, jabonera y portarollo
Total: 17 Pza Obras de arquitectura

Mampostería
Total: 313,8 M2 Recubrimientos y Acabados

Total: 1047,95 M2 Acabados con pintura

Total: 810,58 M2
21,60 ML Herramientas y cajetines

Total: 230,48 M2 Extinción de incendios

Total: 2 Piezas Obras de Servicio

Tanque séptico y fabricado
Suministro y transporte

Total: 2 UND Reformación de Poso

Total: 160, 82 ML Construcción

Puerta de acero
Portón de malla

Total: 184,4 M2 Amortización de elementos de urbanismo

Plantas y arboles variados
Total: 351 UND
Grama
Total: 226, 68 M2
Bancos
Total: 5 Pza
Canal desagüe
Total: 30 ML Obras Eléctricas

Cable monopolar
#2, #8, #10, #12

Total: 629 ML

Tomas Corrientes
Total: 122 UND Instalaciones Sanitarias

Tuberías de aguas claras, residuales, punto
de aguas claras y residuales PVC, suministro
e instalación de llaves de paso y grifo

Total: 41 Pza OBRA: AMBULATORIO TIGRA
DE ACHAGUA

VALOR TOTAL ESTIMADO DE
LA OBRA:
2.470.000.00 Bs. Construcción de Sumidero -Piedra picada: 5,20 m3
-Concreto: 1,50 m3
-Acero de refuerzo 3/8¨: 58Kgf
-Paredes: 104 m2 Construcción de Tanque Séptico -Piedra picada: 3,76 m3
-Encofrado: 51,7 m2
-Concreto: 10,34 m3
-Acero de refuerzo 3/8¨ fy=4200kg/cm2: 418,3kg f
-Acero de refuerzo 1/2¨ fy=4200kg/cm2: 17,86kg f Anclaje de las Columnas Extension del trabajo Estas partidas comprenden el suministro, transporte, confección y colocación, de los
elementos estructurales metálicos constituidos por cabillas, ángulos, pletinas y planchas de necesarios para la fijación de elementos que conformen la estructura metálica.

Los cordones de soldadura deberán cumplir con todos los requisitos exigidos por las normas COVENIN-MINDUR 1618-82 "Estructuras de acero para Edificaciones, Proyecto, Fabricación y Construcción" Extension del trabajo Los elementos de unión Columnas - Vigas y correas de techo - Vigas se realizaran con soldadura cuyo espesor y tipo especifiquen en los planos.
Para las uniones soldadas se debe usar electrodos E-7018 de e = 5mm
Usar maquina de soldar de 300 Amperios
Los perfiles de Columnas, vigas y correas tendrán los siguientes perfiles La partida comprende de la colocación de los anclajes de las columnas estructurales metálicas del ambulatorio, el cuarto de basura y la caseta de bomberos los cuales están conformados por cuatro pernos de acero A 325 de D = 1/2" y 0,6 metros de longitud para el caso del ambulatorio cuatro pernos de acero A 325 de D = 3/8" y 0,64m de longitud para el caso del cuarto de basura y cuatro pernos de acero A 325 de D=3/8" y 0,25m de longitud para el caso de la caseta de bombero, todo con sus respectivas tuercas y arandelas, soldados a dos marcos de angulos de hierro de 20 x 3 x 20mm y arriostrados con dos cabillas lisas de 0,40 m en diagonal