Solutions
Works with
Pricing
Log in
Teams
Get started
Log in
Get started
ME3B1_Group13
RT
by
Robert Teeling
·
3 views
·
Updated Apr 11, 2021
Share
Embed
Create your own
Chapters
00:00
Chapter 1
00:03
Chapter 2
00:13
Chapter 3
00:18
Chapter 4
00:19
Chapter 5
00:25
Chapter 6
00:29
Chapter 7
00:40
Chapter 8
00:42
Chapter 9
00:43
Chapter 10
00:46
Chapter 11
00:46
Chapter 12
00:53
Chapter 13
00:55
Chapter 14
00:56
Chapter 15
01:01
Chapter 16
01:03
Chapter 17
01:05
Chapter 18
01:25
Chapter 19
Prezsssi
Audio Transcript
Auto-generated
00:02 - 00:05
the performance of a pumped hydro station, characterized by several
00:05 - 00:05
different factors.
00:06 - 00:08
The main ones being the height of the system, the
00:08 - 00:10
length of the waterways between the volume of the system
00:11 - 00:13
and the efficiency capacity of the generators.
00:14 - 00:16
The energy in the system, we calculated to use the
00:16 - 00:18
potential energy formula asking machine.
00:19 - 00:21
The potential energy is directly proportional to the height.
00:22 - 00:23
This means that the greater the height of the system,
00:24 - 00:25
the more energy there will be in a.
00:26 - 00:28
Another factor that influenced the system is a cut off
00:28 - 00:31
ratio. There's simply the ratio between the height of the
00:31 - 00:34
system and the length of the waterways in between The
00:34 - 00:37
minimal meant for this is 1-10, meaning that anything below
00:37 - 00:39
this value won't be economically viable.
00:40 - 00:42
Calculated, it's simply the height of the system divided by
00:42 - 00:43
the length.
00:44 - 00:47
This will give you your ratio Interlock hill, the ratio
00:47 - 00:49
has been 3 to 2 and this is calculated as
00:49 - 00:53
the system is 286 m high and the waterways add
00:53 - 00:54
up to 100 91 m.
00:55 - 00:58
This is much greater than the 1-10 ratio, meaning that
00:59 - 01:01
serial killer is very economically viable, hence its construction.
01:03 - 01:07
Next, we'll look into the generators, Interlocking all the generators
01:08 - 01:08
served two purposes.
01:10 - 01:12
The first is to convert the kinetic energy from the
01:12 - 01:15
water into electrical, and the second is to pump the
01:15 - 01:16
water back to the top reservoir.
01:18 - 01:20
Other systems will have two separate machines to serve these
01:20 - 01:23
purposes. However, it's been proven that it's much more and
01:23 - 01:25
much more efficient to have them in one machine as
01:25 - 01:27
Sherlock Hale is running at 80 efficiency.
See full transcript