Loading presentation...

Present Remotely

Send the link below via email or IM

Copy

Present to your audience

Start remote presentation

  • Invited audience members will follow you as you navigate and present
  • People invited to a presentation do not need a Prezi account
  • This link expires 10 minutes after you close the presentation
  • A maximum of 30 users can follow your presentation
  • Learn more about this feature in our knowledge base article

Do you really want to delete this prezi?

Neither you, nor the coeditors you shared it with will be able to recover it again.

DeleteCancel

Make your likes visible on Facebook?

Connect your Facebook account to Prezi and let your likes appear on your timeline.
You can change this under Settings & Account at any time.

No, thanks

Integrated Assignment

No description
by

Azrina Aziz

on 25 April 2014

Comments (0)

Please log in to add your comment.

Report abuse

Transcript of Integrated Assignment

LEVELLING
A type of surveying of which an operation of finding the difference between height and points on the earth’s surface

CHAIN SURVEY
A survey that is carried out by chaining where a steel tape is used to measure along a distance from one station to another station.
Chainage method
: steel tape is used to measure the positions of vital features and taking other parts relative to the tape by offsets.
INTEGRATED ASSIGNMENT
ABD NAJID BIN HJ OMAR
NUR AZRINA @ MARYAM BTE MD AZIZ
DIP/GMT/03

INTRODUCTION
PRO.CO land surveyors carried out a detail survey of Site 8 in order to determine the details of the area to create the site plan.
Chain and compass survey is the simplest and oldest form of land surveying and it is still extensively used.
8
Location:
Sekolah Vokasional Nakhoda Ragam
Site:
Site 8
Area:
876.090𝑚^2
INSTRUMENTS REQUIRED:
Steel Tape
Prismatic compass Tripod
Plumbob
Prismatic Compass
Fiber Glass Tape
INSTRUMENTS REQUIRED:
Levelling device
Tripod
Levelling Staff
Circular Bubble
Compass Survey
A type of surveying of which bearings are taken to determine the positions of stations to produce a plan
Full transcript