Loading presentation...

Present Remotely

Send the link below via email or IM

Copy

Present to your audience

Start remote presentation

  • Invited audience members will follow you as you navigate and present
  • People invited to a presentation do not need a Prezi account
  • This link expires 10 minutes after you close the presentation
  • A maximum of 30 users can follow your presentation
  • Learn more about this feature in our knowledge base article

Do you really want to delete this prezi?

Neither you, nor the coeditors you shared it with will be able to recover it again.

DeleteCancel

PROCESO DE COMMISSIONING

No description
by

CIH Environmental Solutions

on 31 August 2018

Comments (0)

Please log in to add your comment.

Report abuse

Transcript of PROCESO DE COMMISSIONING

COMMISSIONING
Tipos y Definiciones
-RETRO Cx

-RE Cx

-TELE Cx

-CONTINUAL Cx
Es el Commissioning aplicado a un edificio existente al cual no se le realizó Commissioning al momento de su construcción.
Es el proceso de Commissioning aplicado a un edificio al cual se le haya realizado el proceso de Commissioning previamente.
Commissioning realizado a distancia. Mediante este proceso se verifica el funcionamiento del edificio y sus sistemas, de manera remota.
Seguimiento continuo del proceso de Commissioning.
Proceso
de Commissioning

Aplicado a certificación LEED
-Comitente desarrolla el
O.P.R
(Requisitos del Proyecto)
-El equipo de diseño elabora el
-El equipo encargado del proyecto
incorpora los requisitos del Commissioning en la
-El comitente designa un
- Evalua y ajusta

evalúa y ajusta el
CxA Determina:
-Objetivos del personal de O&M capacitado
-Contenido del manual de sistemas
-Los puntos claves de la construcción
-El Agente de Commissioning elabora y presenta un plan de Commissioning basado en el
-
Supervisa
el ajuste, balanceo y pruebas funcionales de los sistemas (TAB).
-El Agente de Commissioning
participa activamente
en la
capacitación al personal
-El Agente de Commissioning elabora el informe de Commissioning y cierra el proceso
-El Agente de Commissioning monitorea el funcionamiento de los sistemas entre 8 y 10 meses posteriores a la ocupación
COMMISSIONING
Proceso de
¿Qué es
COMMISSIONING?

Verificar que todos los elementos fundamentales de un edificio y sus sistemas sean diseñados, instalados y calibrados para su adecuado funcionamiento.
Verificación fundamental de los siguientes sistemas...
AGUA
AIRE ACONDICIONADO
ILUMINACIÓN
New Construction
Créditos según

Core &
Shell
Commercial
Interiors
Schools
Existing
Building
Historia
El proceso de Commissioning comienza siendo aplicado a los barcos de la marina norteamericana.
1897
El Comandante de la nave
era la máxima autoridad en el proceso de Commissioning y se encargaba de:
Diseño
Construcción
Equipamiento
El Comandante, también era responsable de la selección y capacitación de la tripulación.
Actualmente, el Commissioning aplicado a construcciones se basa en el proceso aplicado en barcos y consta de cuatro etapas:
Pre-Diseño
Diseño
Construcción
Ocupación
y Operación
1
2
3
4
COMMISSIONING
-El comitente designa a un
-Elaboración de un
-Agente de Cx:
supervisa
documentación de pruebas
(protocolos, checklist, etc.)
Breve
del proceso de Commissioning
Pre-Diseño
Diseño
Construcción
Ocupación
y Operación
Cx Fundamental
Cx Avanzado
Plan de Commissioning
B.O.D.
(Bases de Diseño)
O.P.R.
&
B.O.D.
Cx Fundamental
Cx Avanzado
Agente de Commissioning (CxA)
Documentación de Diseño
Agente de Commissioning
-Agente de Commissioning
OPR
y el
BOD
OPR
y
BOD
Cx Fundamental
Cx Avanzado
-El Agente de Commissioning
verifica

las instalaciones
Enhanced Cx
Fundamental Cx
Cx Fundamental
Cx Avanzado
ASTM E2813 - 12 Standard Practice for Building Enclosure Commissioning
Envolvente

DE COMMISSIONING
BENEFICIOS
Equipo de Diseño
-Reducción de responsabilidad civil

-Mejoras en el conocimiento para futuros proyectos

-Reducción de los costos de diseño, construcción y operación

-Reducción de los cambios en el diseño
Contratista / Instalador
-Mejora en planificación de la obra

-Reducción de los reclamos durante la obra y la operación
Comitente
-Mejora y optimiza la operación y mantenimiento del edificio

-Reducción en la capacitación en la post ocupación

-Rendimiento edilicio acorde al OPR

-Mejora de documentación operativa

-Reducción del tiempo de parada

-Reduce el costo operativo

-Mejoras en el bienestar y confort de los ocupantes
Certificación LEED
-El equipo de diseño elabora el
B.O.D.
(Bases de Diseño)

TEl estándar 202-2013 de ASHRAE define el proceso de commissioning de acuerdo a 13 pasos funcionales a seguir:

-Concentra los
pendientes
de documentación en instalaciones en el
issue log

-Realiza
reuniones periódicas de seguimiento
de avances sobre pendientes.
Objetivos

Conceptos Básicos del proceso de Cx
Concepto
Historia
Tipos
Beneficios
Cx orientado a la certificación LEED
Valor según Certificación
Etapas del proceso
Ejemplos
RENOVABLES
Credenciales: ASHRAE CPMP
Commissioning Process Management Professional
ASHRAE Guideline 0-2005 – The Commissioning Process
• ASHRAE Guideline 1.1-2007 – HVAC&R Technical Requirements for the Commissioning Process

• ASHRAE Learning Institute course: Commissioning Process in New and Existing Buildings

• ASHRAE Learning Institute course: Commissioning Process and ASHRAE’s Guideline 0

• ACG Commissioning Guideline

• Building Commissioning Association Guidelines on New and Existing Buildings

• Canadian Standards Association Z318.0-05 – Commis­sioning of Health Care Facilities

• National Institute of Building Sciences Guideline 3-2006 – Exterior Envelope Technical Requirements for The Commissioning Process

• NEBB Procedural Standards for Whole Building Sys­tems Commissioning of New Construction

• NEBB Procedural Standards for Retro-Commissioning of Existing Buildings

• SMACNA HVAC Systems Commissioning Manual

• ANSI/ASHRAE/IESNA Standard 90.1-2007 – Energy Efficient Design of New Buildings Except Low-Rise Residential Buildings

• ANSI/ASHRAE Standard 62.1-2007 – Ventilation for Acceptable Indoor Air Quality

• NFPA Standard 90A – Installation of Air-Conditioning and Ventilation Systems
Fuentes
CALIENTE
VENTILACION Y
Estándar 202-2013 de ASHRAE

• El resultado del montaje manual de los sistemas queda asentado en un manual de sistemas de operación y construcción
• Llevar a cabo la capacitación para las operaciones del edificio con planes de entrenamiento y registro
• La puesta en funcionamiento en la post ocupación
• Elaboración de un informe de commissioning en el que se recopila toda la documentación del proyecto
• Verifica el rendimiento de HVAC

• Iniciar el proceso de Commissioning, incluyendo definir roles y responsabilidades
• Definir los requerimientos del proceso, de acuerdo a la documentación del OPR.
• Elaborar un plan de commissioning

• El Plan de Diseño de acuerdo al OPR – define las bases de diseño
• Establecer los requisitos del Commissioning, incluidas en las especificaciones del Commissioning
• El diseño analizado por la autoridad de Commissioning proporciona información y un informe de revisión de diseño

• A través de Submittals Review, se verifica el cumplimiento de la OPR en un informe de revisión de presentación
• A través de la observación y pruebas funcionales, se verifica el rendimiento del sistema con resultados documentados en las listas de comprobación e informes de construcción
• La resolución de inconvenientes es realizada a través de un Issues and Resolutions Log
Fundamental Cx
EAp1:
PRE-REQUISITE
Enhanced Cx
EAc3:
Enhanced (2pts)
EApc65:
Monitoring based (+1pt)
-El Agente de Commissioning revisa la selección de
equipos
y su
cumplimiento de los estándares internacionales
ENERGIAS
Fundamental Cx
EAp1:
PRE-REQUISITE
Enhanced Cx
EAc3:
Enhanced (2pts)
EApc65:
Monitoring based (+1pt)
Fundamental Cx
EAp1:
PRE-REQUISITE
Enhanced Cx
EAc3:
Enhanced (5pts)
EApc65:
Monitoring based (+1pt)
Fundamental Cx
EAp1
PRE-REQUISITE
Enhanced Cx
EAc3
Enhanced (2pts)
EApc65
Monitoring based (+1pt)
EBOM Cx
EAc2.1
Investigation and analysis (2pts)
EAc2.2
Implementation (2pts)
EAc2.3
Ongoing Commissioning (2pts)
Etapas del proceso de
Commissioning LEED
IT – Nivel Subsuelo 3
Incorporar aire exterior a UE-003-01
Health
care
Fundamental Cx
Enhanced Cx
EAc3:
Enhanced (1pt) and/or,
Envelope Cx
(+2pts)
EApc65:
Monitoring based (+1pt)
EAp1:
PRE-REQUISITE
Commissioning Avanzado
-Comitente y/o su representante
desarrollan el
O.P.R
(Requisitos del Proyecto)
Commissioning Avanzado
Commissioning Avanzado
Commissioning Avanzado
Commissioning Avanzado
Commissioning Fundamental
Commissioning Fundamental
Commissioning Avanzado
Commissioning Avanzado
Commissioning Avanzado
Commissioning Avanzado
Commissioning Fundamental
Commissioning Fundamental
Commissioning Fundamental / Avanzado
Commissioning Fundamental / Avanzado
Commissioning Fundamental / Avanzado
Commissioning Fundamental / Avanzado
Commissioning Fundamental / Avanzado
Commissioning Fundamental / Avanzado
Commissioning Avanzado