Loading presentation...

Present Remotely

Send the link below via email or IM

Copy

Present to your audience

Start remote presentation

  • Invited audience members will follow you as you navigate and present
  • People invited to a presentation do not need a Prezi account
  • This link expires 10 minutes after you close the presentation
  • A maximum of 30 users can follow your presentation
  • Learn more about this feature in our knowledge base article

Do you really want to delete this prezi?

Neither you, nor the coeditors you shared it with will be able to recover it again.

DeleteCancel

Make your likes visible on Facebook?

Connect your Facebook account to Prezi and let your likes appear on your timeline.
You can change this under Settings & Account at any time.

No, thanks

DIAGRAMA DE MASAS

No description
by

Jhennifer Ruiz Rozo

on 17 September 2014

Comments (0)

Please log in to add your comment.

Report abuse

Transcript of DIAGRAMA DE MASAS

Movimientos de Tierra
Conjunto de actividades que producen las modificaciones necesarias en el terreno para llegar hasta las cotas de diseño.

Diagrama de masas
Es la gráfica continua que representa el volumen acumulado neto de material desde una estación inicial dada, tomando los cortes como positivos y los llenos como negativos.
Distancia media de transporte
El transporte o longitud promedio de acarreo de un volumen de material excavado con destino a un terraplén es igual a la distancia entre los centros de gravedad de los volúmenes de corte y de relleno.
Longitud de acarreo Libre
Desperdicios y prestamos
Los desperdicios son la diferencia entre los cortes totales y llenos totales. Y se puede determinar en el diagrama de masas. Es decir los volúmenes de corte no compensados.

Los prestamos son volúmenes de tierra que deben ser sustraídos de otros lugares diferentes al sitio de construcción, para compensar que los llenos superen a los cortes realizados en el proceso de construcción.
Longitud total de acarreo
Subrasante mas económica para el movimiento de tierras
Es aquella que ocasiona el menor costo de la obra, es decir antes de ejecutar las operaciones de movimiento de tierra, se deben evaluar diferentes alternativas para de subrasante, en materia de costos referentes a: cortar, excavar, rellenar y transportar, de tal manera que exista un equilibrio, eficiencia en el empleo y disposición del material, y sus sobre acarreos y acarreos según el caso, usando la linea compensadora.
GRACIAS
Aplicación del Diagrama de masas
a los movimientos
de tierra

Geraldine Agudelo Quiñonez- Jhennifer Ruiz Rozo GRUPO 1
Incluye las actividades de:
Limpieza, desmonte y destronque
Excavación (manual o con maquinaria)
Transporte
Relleno
Fuente: Movimientos de tierra http://www.agroterra.com/p/movimientos-de-tierra-3010530/3010530
Propiedades
Compensación de Volúmenes de tierra
Reutilización de material que ha sido banqueado en un tramo determinado, de tal manera que pueda ser usado como relleno en la misma construcción.
Factores Volumétricos
Fuente: DISEÑO GEOMETRICO DE VIAS, Pedro Antonio Choconta Rojas, Transporte de material- Diagrama de masas pag. 194
Fuente: Carreteras y aeropuertos II- Movimiento de tierra Diagrama de masas http://www.pucmmsti.edu.do/websise/estudiante/materias/201220131/ST-IC%20-535-T-001/MOVIMIENTO%20DE%20TIERRA,%20D%20M,IMPRESION.pdf
Fuente:Movimiento de tierras http://es.slideshare.net/mavares46/movimiento-de-tierras
Fuente: Alcaldía de Guayaquil http://noticias.guayaquil.gob.ec/2012/02/municipio-de-guayaquil-inicio-relleno-y.html
Fuente: Movimiento de tierras http://es.scribd.com/doc/76622098/2-Movimiento-de-Tierra-y-Diagrama-de-Masas
Aplicaciones
Distancia a la que cada metro cubico de material puede ser movido sin que se haga, un pago adicional. En otras palabras es la distancia a la cual el acarreo esta incluido dentro del precio de excavación.
Fuente: material para la construcción FLETES Y ACARREOS
http://morelos.quebarato.com.mx/cuernavaca/material-para-la-construccion-fletes-y-acarreos__79434B.html
Sobre acarreo
Es el valor del transporte por metro cubico de material en toda la longitud que exceda la distancia de trasporte libre.
Cuando el trayecto que hay que compensar es muy largo, puede suceder que sea mas económico botar lo excavado y obtener una zona de préstamo del material para el terraplén. la máxima longitud a la cual resulta económico trasportar, se denomina
limite máximo de acarreo económico

conclusión

¿PREGUNTAS?
• La curva asciende de izquierda a derecha en los límites de un corte y desciende en los rellenos.
• Se verificara un máximo en la curva en los lugares donde se pasa de corte a relleno y un mínimo en lugares donde se pasa de relleno a corte.
• Se indica una compensación entre los cortes y rellenos entre dos puntos en toda línea horizontal que toque el diagrama de masas en esos dos puntos.
• La diferencia de ordenada entre dos puntos nos indicara la diferencia de volumen de tierra entre la distancia que separa esos dos puntos.
• El área comprendida entre una línea compensadora y el diagrama representa el volumen por longitud media de acarreo.