Loading presentation...

Present Remotely

Send the link below via email or IM

Copy

Present to your audience

Start remote presentation

  • Invited audience members will follow you as you navigate and present
  • People invited to a presentation do not need a Prezi account
  • This link expires 10 minutes after you close the presentation
  • A maximum of 30 users can follow your presentation
  • Learn more about this feature in our knowledge base article

Do you really want to delete this prezi?

Neither you, nor the coeditors you shared it with will be able to recover it again.

DeleteCancel

Make your likes visible on Facebook?

Connect your Facebook account to Prezi and let your likes appear on your timeline.
You can change this under Settings & Account at any time.

No, thanks

Why_serdar_ayten

No description
by

Serdar Ayten

on 21 September 2016

Comments (0)

Please log in to add your comment.

Report abuse

Transcript of Why_serdar_ayten

iCan
iWill
iLearn
Graduated from
Dokuz Eylul University
Mechanical Engineering
Six Sigma Black Belt
Construction Concentration
PMP #

Example #3
Graduated from
KOC University
Executive MBA
Certification
iAdapt
From Hometown to Istanbul
Twelve Years ago, I moved from Izmir to Istanbul
Business Trips to abroad
More than eight times to China.
Many times to Germany.
iExperience
Arcelik Electronics
Product Design from 19" to 55" LCD and LED Tv.
Arcelik Washing Machine Company
Manage Major Tv Projects
Manage Projects
iManage
19"-20"-22"-26"
Grundig LCD TVProject
Innovative and Challenge Project
No Screw
50 % Improvement in Packaging.
50 % Slimmer
Improvement Labor Cost
Improvement Material Cost
2 mio Euro Budget
Four Different sizes
Manage Design Team from Germany
Lead more than twenty Project Team members coming from different departments.
Build-up Team
Manage Stakeholders
Grundig Major Platform Projects
Gather Requirements from stakeholders
iPatent
Patents
A laundry washing or laundry washing-drying machine drum WO 2013030394 A3
Light guide WO2008029347 A3
An electronic device that can be hung on the wall WO 2012084478 A1
A television
WO 2008149262 A1
Releasable snap-lock connection of a front panel element to an image display device EP2353290A1
iSkill
Product Development&Quality
Strong Ability to Use 6 sigma tools and FMEA
Strong Ability to use Design Tools
Strong ability to use quality tools.
Benchmarking.
Strong ability to use office software
Organizational Development, Operational Management
Team Building, Coaching and Training.
Time Management & Prioritization
Work Effectively in a Team-Oriented
Stakeholder Satisfaction.
Project initiating, Planning, Execution, Monitoring and Controlling and Closing.
Leadership&Management
PMP Certification.
Productivity, Efficiency, and Performance Improvements
My motivation is to become a member of the first one; rather, I will somehow be promoted from second one to first one in Europe.
A cash register WO 2009083824 A1
A display device
EP 2347641 A1
Eight more pending after 2013
Business Administration
Project Management Professional, PMP
Gained new friends
You should strictly follow up them to get tasks done.
You should build up good relationship and gain their trust.
You should know how they are serious and strictly abide by the rules.
Highlighted
Manage Major Platform Project
Grundig
OEM -- Cylinda, Smeg
Three different companies with successful jobs.
Digesting whole LCD TV product development process.
Digesting whole Washing Machine product development process.
Close relationship among Internal Customers
iSocial
Financial Data Analysis: Budgeting & Operational Cost /Margin Controls, P&L Analysis, Profitability, Liquidity, and Growth analysis.
Investment Decision; PV-NPV-IRR-PP
Two times to Korea and to Italy
OEM Project
Smeg-Cylinda
The project was finalized on time, on budget, and on scope.
Unigraphics-Tracepro-CF Design
I believe that I will repeat my successful jobs in forth one.
Knob and Light Guide Design
Light Guide Analysis
While working on Actual Knob
Another Light Guide Design and Analysis
Works in Arcelik Washing Machine Plant
Front Panel Design
I completed whole assembly with in 5 weeks before prototyping. (If Electronic Board's Dimensions are fixed)
Front Door Design
Mechanical Design was ready to prototype within 4 weeks.
Actual Product
Wile working with the test technicians
Liquid Dosing System Design
Prototype of L.D.S
Front Panel Design with touch buttons
Actual Product
Front Panel Design with Touch Buttons
(Grundig)
Test Process
Actual Product
Grundig
Getting an award from Asst. General Manager in Washing Machine Plant
Briefly
I am good at
Product Development.
Fast Mechanical Design.
Product Development Process
CAD softwares.
Unigraphics-Tracepro-CF Design

Quality Tools
6 Sigma
Minitab
Project Management
Project Processes
Microsoft Project
Primavera
Following up the tasks
Team Management

Market Analysis
Product Definition
Industrial Design
Benchmarking
Mechanical Design
Hardware and Software Design
System Design
Design Review
Prototyping
Improvements if needed
Molding
Samples
Test and Verifications
Pilot Production
Mass Production
NOT INVOLVED
INVOLVED (for feasibility)
INVOLVED (for Infrastructure)
INVOLVED
HIGHLY INVOLVED
NOT INVOLVED
INVOLVED
HIGHLY INVOLVED
HIGHLY INVOLVED
HIGHLY INVOLVED
NOT INVOLVED
HIGHLY INVOLVED
INVOLVED
INVOLVED
INVOLVED (In the beginning)
What I simply understand and how I am involved in the Product Development Process
Module Design
Design a ring Light Guide with two leds
Prototype
Actual Product
Design an LCD TV
Actual Product
55" 3D TV Design (Aluminum)
Actual Product
Some Other TV Designs
While working in Arçelik Electronic
Getting an award from Asst. General Manager in Electronic Plant
Some Works on Arcelik Electronic Plan
Full transcript