Loading presentation...

Present Remotely

Send the link below via email or IM

Copy

Present to your audience

Start remote presentation

  • Invited audience members will follow you as you navigate and present
  • People invited to a presentation do not need a Prezi account
  • This link expires 10 minutes after you close the presentation
  • A maximum of 30 users can follow your presentation
  • Learn more about this feature in our knowledge base article

Do you really want to delete this prezi?

Neither you, nor the coeditors you shared it with will be able to recover it again.

DeleteCancel

Make your likes visible on Facebook?

Connect your Facebook account to Prezi and let your likes appear on your timeline.
You can change this under Settings & Account at any time.

No, thanks

Copy of My Prezume

CV
by

so crazy

on 16 February 2014

Comments (0)

Please log in to add your comment.

Report abuse

Transcript of Copy of My Prezume

Solar Power System Installation
Project Management
Instructor: Dr. Itihad Al Amer

Presented by:
Basma Al Hammadi (H00154330)
Safiya Al Hammadi (H00154249)

Current Solar Technology
Types of Solar Energy Systems
Passive
-involves the design of buildings, homes and lighting
-focuses on the placement of the home or building to acquire as much energy as possible from sunlight
-involves the use of walls, windows, roofs, floors, landscaping and home exteriors to maximize the control over heat from the sun
-considerations to be acknowledged when designing a house for passive solar energy (Mother Nature Network, 2012):
-site location: the house should be located in an area where there will be sun (example: building a home in the midst of a thick forest and expecting to use a passive solar system to get heating and cooling probably won't work)
-seasonal shading: the house must also be designed so that there will be minimal heat from the sun during the summer and an optimal amount of heat from sun during the cold winters. This is usually done by the design of the roof.
-orientation: windows should be pointing to the south so there is exposure from the sun.
How is Electricity Produced?
Photovoltaic (PV)
A photovoltaic panel (or a solar panel) is made up of photovoltaic cells. These cells are semiconductors and are usually made from silicon. The PV panels also have anti-reflective coating so that the maximum amount of sunlight is absorbed instead of being reflected.
The semiconductor also has a positively charged side and a negatively charged side (usually made of boron and phosphorus). When sunlight is absorbed, the positively and negatively charged sides are stimulated and a direct current is produced.
This current must be changed to an alternating current in order to be used for electricity. This change from DC to AC occurs in an inverter.
This alternating current then travels to the fuse box, where it is distributed to the appliances in different rooms where it is needed.
The metering box (as shown in the image to the right) can also be used for homeowners to gain money from energy suppliers. The metering box shows how much electricity is generated from the PV panels. The generated electricity that is not used by the homeowner can also be used to help supply electricity for the electrical grid.
Active
-involves the use of other mechanisms to make electricity or heat
-solar panels are used to absord solar energy to be used in solar water heaters to provide heat/cool air to a building (solar collectors) or to convert sunlight into electricity by using a semi-conductive panel to generate electricity when stimulated by the sun
-other active solar power systems are:
-solar ponds
-dish systems
-dish-engine systems
-trough systems
-solar power towers
-solar furnaces

"Why do you think this form of generating electricity will or will not become the principal source of electricity in the future?"
I think that solar energy could become the principle energy source because although it is expensive to install initially, there will most likely be an overall decrease in utility taxes and money earned from energy suppliers could be enough to recover the amount of money that was lost due to installations. Also, solar energy is environmentally-friendly, which is something everyone should be looking for, due to the impact of global warming on animals everywhere. The sun is guaranteed to be around for billions of years, so despite the fact that the sun is not available all 24 hours of the day, it will be available for billions of years. The advantages greatly outweigh the disadvantages and for these reasons, I believe that solar energy should become the principle source of electricity in the future.
Outline
Project requirements & constraints
Install Solar power system
Into 50 villas
power of 3200W

Constraints
:

2 to 3 laborers
Budget of 1500000 AED
Within 60 days

Requirements:
Components Required
Main Component
Accessories

Battery Bank (6)
Solar panel (8)
Charge Controller (1)
Inverter (1)
Tasks
required

Searching for
the components
Purchasing Solar power system
Installing
Testing
Provide training
Maintenance

Work Breakdown Structure
Network Diagram
Critical Path

Risk management

Manage internal & external risks

RBS (Risk Breakdown Structure)
Time & Resource constrained schedule
Time constrained schedule
Limit and fixed deadline Flexible number of resources Require use of leveling technique

Resource constrained schedule
fixed resources flexible time Require use of parallel method
Technical Risk
(Installing)
External Risk

(Weather)
Description
Improper installation
Root Cause
Lack of experience


Potential Responses
(Mitigate)
- Train the staff.
- Provide manuals

Probability
(
0.2)
expert staffs are responsible to do the work. So, there will be less problems

Impact
(
0.60 H)
Any small mistake in installing will affect the whole system
Contingency Plan
Call a professional person to check the problem.

Description
- Rainy weather
- Dusting storm


Potential Responses
(Accept)
- Cannot predict weather
changes.
-Put another plan in case the
weather changed


Probability
(0.2)
Dry environment
Impact
(0.40 M)
Rainy days affects working surface it becomes slippery. This cause injuries


Organizational Risk

(Resources)

Description
Short-handed


Root Cause
Lack number of laborers to work on this project
.

Probability (0.2)
projects planned by professional people who estimate the number of laborers


Impact (0.60 H)
cause a pressure on the workers
Contingency Plan
Bring extra workers.
Project Management Risk

(communication)
References
http://www.cio.com/article/717321/12_Common_Project_Management_Mistakes_and_How_to_Avoid_Them?page=2&taxonomyId=3013

http://www.pursolaraz.com/learn-about-solar/what-affects-solar-panel-efficiency-2/

http://www.bia.ca/articles/rm-risk-management.htm
Chapters (7, 8)
http://elektronikabg.com/en/product/652/400w-photovoltaic-system-for-houses-villas-bungalows-and-other.ht

http://www.altestore.com/store/Charge-Controllers/Dump-Loads-Dump-Load-Controllers/Diversion-Dump-Load-Controllers/Solar-Converters Turbine-Dump-Load-Controller-12V-100A/p2572/

http://www.ebay.com/itm/3000W-5000W-6000W-8000W-15000W-Pure-Sine-Wave-Power-Inverter-12-24-48VDC-Charger-/261227559430?pt=UK_Gadgets&var=&hash=item3cd2603a06

http://www.amazon.com/MAXCRAFT-7687-Self-Tapping-Assortment-200-Piece/dp/B0037UWSCS/ref=sr_1_14?s=industrial&ie=UTF8&qid=1384194637&sr=1-14


http://www.amazon.com/MAXCRAFT-7687-Self-Tapping-Assortment-200-Piece/dp/B0037UWSCS/ref=sr_1_14?s=industrial&ie=UTF8&qid=1384194637&sr=1-14

http://www.ebay.com/itm/10pcs-15mm-Vinyl-Electrical-Tape-Insulation-Adhesive-Tape-White-/170869312064

http://www.ebay.com/itm/Universal-solar-panel-pole-mount-kit-holds-2-large-panels-fits-a-2-pipe-/181223665389

http://www.ebay.com.au/itm/BLACK-WHITE-TRACER-30M-ROLL-BATTERY-CABLE-TRADE-3MM-AUTO-ELECTRICAL-WIRE-DC-12V-/281199165218

Thank you for your attention
please feel free to ask

Project requirements & constraints

Components required

Tasks required

WBS (Work Breakdown Structure)

Network diagram

Critical path

Risk management plan

Time & Resource constrained schedule

Contingency Plan
Working indoor

Root Cause
Unforeseen condition forces to stop the work
Potential Responses
(Avoid)
Hire enough number of workers



Contingency Plan
Arrange face to face meeting
Impact
(0.60 H)
Poor communication creates uncertainty that leads to stress
workers will do the work without monitoring.
Probability
(0.2)
Professional manager is provided to achieve project objective

Potential Responses
(Mitigate)
Set timeline for meeting to discuss the work.
Root Cause
- Careless in managing
- lack of supporting

Description
Poor Communication