Loading presentation...

Present Remotely

Send the link below via email or IM

Copy

Present to your audience

Start remote presentation

  • Invited audience members will follow you as you navigate and present
  • People invited to a presentation do not need a Prezi account
  • This link expires 10 minutes after you close the presentation
  • A maximum of 30 users can follow your presentation
  • Learn more about this feature in our knowledge base article

Do you really want to delete this prezi?

Neither you, nor the coeditors you shared it with will be able to recover it again.

DeleteCancel

ComEd v6

No description

Comments (0)

Please log in to add your comment.

Report abuse

Transcript of ComEd v6


Institutions and Architectures

US Central Business District

Infrastructure


Smart Meter Exchange Timeline


Exchange Logistics


RF Propagation


555 W. Madison Street

Presidential Towers
Meter size:
2,359

400 E Randolph
Completed:

Sept 14, 2015
Meter size:
960

400 E Randolph
Meter size:
280


West Chestnut
TSS 153 Taylor Substation

Navy Pier
How
SOFT LAUNCH
Chicago High-Rise

Smart Meter
Deployment Approach

Soft launch approach
Help understand RF propagation in meter exchange logistics
Chose buildings of multiple meter types
Chose buildings of various meter counts
Chose buildings in close and distant proximity

Initial network deployment – AP installations
Utilizing high-rise area substations
Utilize select high-rises requiring APs

NETWORK
Full high-rise deployment
Phased meter exchanges, radially from previously deployed infrastructure
Specific network designs for >250 meter-count high-rises
Use of existing periodic to help to determine RF propagation
Use of new Standard RF solutions
High-rise specific communications and exchange logistics

FULL HIGH-RISE
Chicago High-Rise
Smart Meter
Deployment Approach

DEPLOYMENT
DEPLOYMENT
Done?
Was It

Meters


Buildings

Access points
Requiring RF triage

Meter exchanged
TDC785 Ontario Substation
TDC87 Dearborn Substation
87,000
>2,000
World Renowned
2nd Largest
No Distribution Pole
9 Month
Unique
Unknown

TDC49 Plymouth Substation
TDC68 Lasalle Substation
47,000
26
41 Meters
1 W Superior Street
Completed:

Sept 21, 2015
Meter size:
960

One Superior Place
Completed:
June 15, 2015
100 W. Chestnut
Completed:

July 28th, 2015
October 2015
October 2015
October 2015
November 2015
November 2015

High-rise walk down designs
131
November 2015
233 S. Wacker

Meter size:
409

WIllis Tower
875 N. Michigan Ave
Meter size:
993

John Hancock Center
111 S. Michigan Ave
Meter size:
22

Art Institute
of Chicago
401 N Wabash Ave

Meter size:
727

TRUMP International Hotel & Tower
300 N State St.
Meter size:
928

Marina Tower Condos

Micro-Access
points
290