Loading presentation...

Present Remotely

Send the link below via email or IM

Copy

Present to your audience

Start remote presentation

  • Invited audience members will follow you as you navigate and present
  • People invited to a presentation do not need a Prezi account
  • This link expires 10 minutes after you close the presentation
  • A maximum of 30 users can follow your presentation
  • Learn more about this feature in our knowledge base article

Do you really want to delete this prezi?

Neither you, nor the coeditors you shared it with will be able to recover it again.

DeleteCancel

Strabag

No description
by

PreziAll

on 21 October 2014

Comments (0)

Please log in to add your comment.

Report abuse

Transcript of Strabag

Increased safety for crossing bicyclists, pedestrians etc.
Reduction of airborne soud and structure borne noise
Vertical elasticity -> No "jump effect"
Maintenance free for more than 20 years
Projectteam
Winter facilities
Sleepers
According to the specifications
Different supplier
Deviations
Suitable for (nearly) all rail profiles
Applicable for (transition) curves
Special parts for turnouts
Integration of insulation joints
Edilon LC
Bodan
R&M Undersleeper Pad
Sturcture-borne sound insulation up to 10dB (A)
Reduction of structure-borne sound of ca. 3 - 10dB (A)
Reduction of the volume of ballast in the base and head ballast
Position changes of the track are reduced by a factor of 4 compared to sleepers without soles
100% recyclable
Durability >60 years
LCC can be reduced by a factor of 2 to 3

Demper mats
Undersleeperpads - NOK 1.500.000
Changes / alternatives

NOK 137.639.123
EUR 17.513.544
Basic offer

Influences
(external)

Client/
supplier meeting

Communication
Scope
Contract
Environment
Subcontractors
Quality plan
Payment plan
Breakdown
of work
"as built"
Documents
schedule
Environmental monitoring plan
Plan of approach

Supply schedule
Construction
forms

Area progress schedule
Receive materials (RMF)
Manpower schedule
Multiple teams/activities simultaneously

Material acceptance and factory tests (MAF)
Monthly report
Receive
materials
(RMF)
Material acceptances and factory tests (MAF)
Construction forms (CRF)
Purchasing
Measuring
Quality control construction
Quality control materials
MAF forms
RMF forms
Construction forms (CRF)
Changes/deviations/alternatives
Materials
Subsuppliers/subcontractors
Construction
Safety
Health
Increase capacity per team
Longer shifts (12hr instead of 8hr)
Day / night / weekend schedule
Track 6
Depot 1
Level crossings - NOK 6.250.000
Main workflow per area
Workflow
Materials
Budget/Costs
Risk analysis/
reports

Quality
Progress
schedules

Monthly report
Client
deliveries
Construction-
folder
Work
instructions/procedures
Safety instructions
Purchase orders
Regular capacity
Logistic plan
Execution plan
Knowledge
Toolbox meeting
Internal meeting
Capacity
Skills
General
progress schedule
Construction manager safety schedule
Construction site regulations
Health and safety cards

Maintainability
Reliability
Availability
CO2 emissions reduction
Innovation
Milling rails