Loading presentation...

Present Remotely

Send the link below via email or IM

Copy

Present to your audience

Start remote presentation

  • Invited audience members will follow you as you navigate and present
  • People invited to a presentation do not need a Prezi account
  • This link expires 10 minutes after you close the presentation
  • A maximum of 30 users can follow your presentation
  • Learn more about this feature in our knowledge base article

Do you really want to delete this prezi?

Neither you, nor the coeditors you shared it with will be able to recover it again.

DeleteCancel

Make your likes visible on Facebook?

Connect your Facebook account to Prezi and let your likes appear on your timeline.
You can change this under Settings & Account at any time.

No, thanks

POWER GRID CORPORATION OF INDIA LIMITED

This a college presentation o the industrial summer training.This presentation explains the working of powergrid.
by

sourabh sinha

on 9 October 2012

Comments (0)

Please log in to add your comment.

Report abuse

Transcript of POWER GRID CORPORATION OF INDIA LIMITED

GIS SUBSTATION AT MAHARANIBAGH
(NEW DELHI) ABOUT POWER GRID
CORPORATION OF INDIA ABOUT MAHARANIBAGH
GIS SUBSTATION DESIGNING OF MAHARANIBAGH GIS SUBSTATION POWER GRID DIVERSIFICATION INTO
TELECOMMUNICATION EMERGENCY AND PROTECTION SYSTEM AT
MAHARANIBAGH GIS SUBSTATION ANY QUERIES? POWER GRID IS A NAVRATNA PUBLIC SECTOR ENTERPRISES DECLARED BY GOVERNMENT OF INDIA IN 1997 ,ENGAGED IN POWER TRANSMISSION BUSSINESS. POWER GRID WHEELS MORE THAN 45% OF TOTAL POWER GENERATED. POWER GRID OWNS AND OPERATES MORE THAN 61,700 CIRCUIT KM OF TRANSMISSION LNES ALL OVER THE INDIA PGCIL INCREASED ITS CAPACITY OF TRANSMISSION FROM 132KV,220KV,400KV,800/765KV OF EHVAC
TO CAPABILITY OF 500KV TRANSMISSION IN HVDC PGCIL PLANNING TO CONNECT THE ALL THE RLDC (REGIONAL LOAD DISPATCH CENTERS) WITH NLDC (NATIONAL LOAD DISPATCH CENTERS) TO CREATE A ULDC (UNIFIED LOAD DISPATCH CENTER). PLANNING AND DEVELOPMENT OF PGCIL MAHARANI BAGH 400/220 KV SUBSTATION BUILT UNDER THE TALA TRANSMISSION SYSTEM. THIS SUBSTATION WAS COMMISIONED IN 2007. THIS SUBSTATION IS REMOTE CONTROLLED OPERATED BY THE BALLABGARH CONTROL CENTER. IT HAS TWO INPUT LINES FROM BALLABHGARH AND DADRI THERMAL POWER PLANTS. MAINTENANCE FREE SF6 GAS INSULATED SWITCH GEAR SYSTEM INSTALLED WHICH ENSURES 65% SPACE SAVING THAN CONVENTIONAL (AIR INSULATED SWITCH GEAR ) SUBSTATIONS. VS MAHARANIBAGH GIS SUBSTATION IS DESIGNED INTO FOUR MAJOR DIVISIONS GAS INSULATED SWITCH GEAR SUBSTATION AUTOMATION 4OO/220/33 KV THREE PHASE AUTO TRANSFORMER SWITCHYARD SWITCH YARD IS A PLACE WHERE CURRENT COLLECTS FROM TRANSMISSION LINES WHAT IS SWITCH YARD? COMMONLY KNOWN AS CVT CAPACITY VOLTAGE TRANSFORMER AT MAHARANIBAGH SUBSTATION
THE INCOMING TRANSMISSION LINES
ARE MADE UP OF ACSR (ALUMINIUM
CONDUCTOR WITH STEEL REINFORCED) CONDUCTORS LIGHTENING ARRESTOR SWITCH YARD CONTAINS VARIOUS TYPES OF EQUIPMENTS ALSO CALLED AS SURGE ARRESTOR ALSO KNOWN AS LINE TRAP WAVE TRAP SWITCHGEAR IS A COMBINATION OF ELECTRICAL DISCONNECTING DEVICES USED TO DEENERGIZE EQUIPMENTS TO WORK ON THE FAULTY SECTIONS. OPERATION OF A CIRCUIT BREAKER IN A SWITCH GEAR WHAT IS A SWITCH GEAR? SWITCH GEAR ARE BASICALLY OF THREE TYPES AIR INSULATED SWITCHGEAR
OIL INSULATED SWITCH GEAR
GAS INSULATED SWITCH GEAR MAHARANIBAGH SUBSTATION IS A GAS INSULATED SWITCHGEAR SUBSTATION ELABORATED EXPLANATION OF PUFFER PRINCIPLE A SUBSTATION AUTOMATION HAS THREE LEVELS : PUFFER ACTION IS THE PRESSURISATION OF GAS TO PRODUCE SUFFICIENT FLOW TO EXTINGUISH THE ARC BETWEEN THE CONTACTS STATION
BAY
PROCESS MAHARANIBAGH GIS SUBSTATION IS BASED ON MICRO SCADA INSTALLED BY CORP. SUBSTATION PROVIDES ONLINE MONITORING OF TRANSFORMERS AND CONTROLLING OF ALL EQUIPMENTS IN CASE OF MALFUNCTIONING BASICALLY THIS MICRO SCADA SYSTEM MADE THIS STAION AS UNMANNED REMOTE OPERATED STATION THIS SUBSTATION WAS MONITORED BY BALLABGARH THERMAL POWER STATION AND BY THE AUTHORIZED ENGINEERS JUST WITH A SET OF LAPTOP THE INCOMING VOLTAGE AT MAHARANIBAGH SUBSTATION IS 400 KV 400KV IS STEP DOWN TO 220KV AND 33KV WITH THE HELP OF TWO TRANSFORMERS
NAMED AS ICT-1 AND ICT-2 Where ICT stands for INTER CONNECTED TRANSFORMERS
which are interconnected with bus couplers HOW? POWER GRID CORPORATION OF INDIA LIMITED
DIVERSIFYING INTO TELECOM BUSSINES ? WITH THE HELP OF UNIFIED LOAD DISPATCH CENTERS (ULDCs) USING THE TRANSMISSION LINES FOR BROADBAND TELECOMMUNICATION TRANSMISSION PURPOSE ALSO. THIS IS POSSIBLE BY USING THE ELECTRICAL POWER AS CARRIER SIGNALS IN THE TRANSMISSION LINES WHICH HELP THE INFORMATION SIGNALS TO TRANSFER FROM ONE DISPATCH CENTER TO ANOTHER. THESE SIGNALS ARE MODULATED WITH POWER WHICH DEMODULATED AT EVERY SUBSTATION WITH THE HELP OF AN EQUIPMENT KNOWN AS WAVE TRAP. MAHARANI BAGH SUBSTATION HAS AN EXCELLENT POWER BACK UP SYSTEM. IT USE THREE STAGE POWER SUPPLY:
PRIMARY A.C. POWER SUPPLY
A.C. EMERGENCY SUPPLY (USING DIESEL GENERATORS)
D.C. SUPPLY (USING BATTERIES) FIRE FIGHTING SYSYTEM TRANSFORMER DELUGE SYSTEM THE FIRE PROTECTION SYSTEM AT MAHARANI BAGH SUBSTATION IS DESIGNED ON THE BASIS OF NATIONAL FIRE PROTECTION SYSTEM. TRANSFORMERS ARE THE DEVICES WHICH ARE ONE OF THE COSTLIER DEVICES AT SUBSTATION AND MORE PRONE TO FIRE AS THESE CONTAINS OIL AND HEATS UP RAPIDLY THEY ARE:
LIFE SAFETY
PASSIVE FIRE PROTECTION
ACTIVE FIRE PROTECTION
MANUAL FIRE PROTECTION THANK YOU CREATED BY : SAURABH SINHA REFFERENCE FROM : PGCIL Maharani Bagh Substation (new delhi), Google.com, ABB corp. , youtube.com CONDUCTORS
METERING DEVICES
PROTECTION DEVICES SURGE ARRESTORS ARE INSTALLED AT THE ENTRANCE OF TRANSMISSION LINE TO PROTECT FROM SURGE VOLTAGES DUE TO LIGHTENING STRIKES, EQUIPMENT FAULTS OR ANY OTHER FAULTS. THE ARRESTOR USES GAS FILLED GAP THAT ACT AS AN OPEN CIRCUIT BUT DURING OVER VOLTAGE THE GAS IONIZED AND LET THE OVER VOLTAGE GROUNDED. FOR EVEY PHASE THERE IS A SEPERATE LIGHTENING ARRESTOR IS INSTALLED. CVT IS A METERING DEVICE USED FOR LOWERING THE EXTRA HIGH VOLTAGE INTO LOW VOLTAGE FOR MEASURMENT IN ORDER TO PROTECT THE RELAYS IT TRAPS HIGH FREQUENCY COMMUNICATION SIGNALS AND DIVERT IT TO THE TELECOMMUNICATION /TELE PROTECTION PANNEL THIS TECHNIQUE IS ALSO KNOWN AS PLCC (POWER LINE CARRIER COMMUNICATION) WAVE TRAP IS ALWAYS PUT ON Y PHASE AS IT IS LESS PRONE TO FAULTS.
B-PHASE PRONE TO EARTH FAULTS.
R-PHASE IS PRONE TO LIGHTENING FAULTS ADVANTAGES OF USING SF6 GAS IN GAS INSULATED SWITCHGEAR SULPHUR HEXA FLOURIDE IS : TASTELESS ,COLOURLESS,ODOURLESS,NON-TOXIC IT IS STABLE UPTO 500degree celcius IT IS 5 TIMES HEAVIER THAN AIR AND 2-3 TIMES BETTER INSULATING ABILITY THAN AIR IT IS INERT SO DOES NOT REACT WITH ANY OTHER GASES. IT DECOMPOSES AT VERY HIGH TEMPERATURE BUT RECOMBINES VERY WELL WHEN THE TEMPERATURE DROPS.