Loading presentation...

Present Remotely

Send the link below via email or IM

Copy

Present to your audience

Start remote presentation

  • Invited audience members will follow you as you navigate and present
  • People invited to a presentation do not need a Prezi account
  • This link expires 10 minutes after you close the presentation
  • A maximum of 30 users can follow your presentation
  • Learn more about this feature in our knowledge base article

Do you really want to delete this prezi?

Neither you, nor the coeditors you shared it with will be able to recover it again.

DeleteCancel

ComEd v5

No description

Comments (0)

Please log in to add your comment.

Report abuse

Transcript of ComEd v5


Institutions and Architectures

US Central Business District

Infrastructure


Smart Meter Exchange Timeline


Exchange Logistics


RF Propagation


555 W. Madison Street

Presidential Towers
Meter size:
2,359

311 S. Wacker


Meter size:
329

311 South Wacker
100 W. Chestnut

Meter size:
280


West Chestnut
TDC49 Plymouth Substation
TSS 153 Taylor Substation

Navy Pier
233 S. Wacker

Meter size:
409

WIllis Tower
875 N. Michigan Ave
Meter size:
755

John Hancock Center
111 S. Michigan Ave
Meter size:
?

Art Institute
of Chicago
How
SOFT LAUNCH
Chicago High-Rise

Smart Meter
Deployment Approach

Soft launch approach
Help understand RF propagation in meter exchange logistics
Chose buildings of multiple meter types
Chose buildings of various meter counts
Chose buildings in close and distant proximity

Initial network deployment – AP installations
Utilizing high-rise area substations
Utilize select high-rises requiring APs

NETWORK
Full high-rise deployment
Phased meter exchanges, radially from previously deployed infrastructure
Specific network designs for >250 meter-count high-rises,
Use of existing periodic to help to determine RF propagation
High-rise specific communications and exchange logistics

FULL HIGH-RISE
Chicago High-Rise
Smart Meter
Deployment Approach
DEPLOYMENT
DEPLOYMENT
Done?
Was It

Meters


Buildings

Micro-APs
Requiring RF triage

Meter exchanged


Aps
TDC785 Ontario Substation
TDC87 Dearborn Substation
TDC68 Lasalle Substation
87,000
>2,000
World Renowned
2nd Largest
No Distribution Pole
9 Month
Unique
Unknown

47,000
26
290
41 Meters
Full transcript