Loading presentation...

Present Remotely

Send the link below via email or IM

Copy

Present to your audience

Start remote presentation

  • Invited audience members will follow you as you navigate and present
  • People invited to a presentation do not need a Prezi account
  • This link expires 10 minutes after you close the presentation
  • A maximum of 30 users can follow your presentation
  • Learn more about this feature in our knowledge base article

Do you really want to delete this prezi?

Neither you, nor the coeditors you shared it with will be able to recover it again.

DeleteCancel

Make your likes visible on Facebook?

Connect your Facebook account to Prezi and let your likes appear on your timeline.
You can change this under Settings & Account at any time.

No, thanks

Greater Male' Region Development

No description
by

Mohame Ibrahim

on 1 August 2013

Comments (0)

Please log in to add your comment.

Report abuse

Transcript of Greater Male' Region Development

Estimated Population
8,000 +
Migrating Population
4, 000
Total : 12,000
(Population
Needs to be increased
to make community viable)

Male’ South Reclamation
Male’ South Reclamation (Relocation of workshops and warehouses)
DEVELOPMENT PHASES
Male’ Decongestion Challenges
The population of Male’, needs dissemination as carrying capacity on the island for a reasonable lifestyle has been exceeded.
Greater Male’ Region
Development

Land reclamation is initiated to pay for the construction of bridges connecting Hulhu-Male’ and Vili-Male to Male.
A STRATEGIC FEASIBILITY AND TECHNICAL STUDY WILL BE ESSENTIAL FOR A PROJECT OF THIS MAGNITUDE. THE STUDY WILL INVOLVE THE FOLLOWING:
The population does not have the critical mass to cost effectively provide for itself services which are municipal or commercial.
Male’ South-West Harbor Expansion
Male’ Southwest harbor is currently unable to cope with the demand. The narrow lagoon which exists between the breakwater (tripods) and the sea wall was never meant to be a part of the harbor.
Male’ South Reclamation
TOTAL AREA
142,460 sq M
EXTENDABLE AREA
37,593 sq M
AREA NOW
104,867 sq M
Male’ South-West Harbor Expansion
GREATER MALE REGION

MALE'
HULHULE' AIRPORT
VILIMALE'
Estimated Population
8,000

GULHI FALHU
Industrial
THILAFUSHI
Mixed
Development

HULHUMALE'
Estimated Population
15,000

Estimated Population
150,000

GREATER MALE REGION
Migrating Population
MALE'
HULHULE' AIRPORT
VILIMALE'
Estimated Population
8,000

GULHI FALHU
Industrial
THILAFUSHI
Mixed
Development

HULHUMALE'
Estimated Population
15,000

Estimated Population
150,000

Estimated Migrating Population 14,000 (2012-2013)

Estimated Population 15,000 +
Migrating Population 14, 000
Total : 29,000

MALE'
HULHULE' AIRPORT
VILIMALE'
Estimated Population
8,000

GULHI FALHU
Industrial
THILAFUSHI
Mixed
Development

HULHUMALE'
Estimated Population
15,000

Estimated Population
150,000

Estimated migrating Population
4,000
(Projected)

Estimated Population
8,000 +
Migrating Population
4, 000
Total : 12,000
(Population
Needs to be increased
to make community viable)

MALE'
HULHULE' AIRPORT
VILIMALE'
Estimated Population
8,000

GULHI FALHU
Industrial
THILAFUSHI
Mixed
Development

HULHUMALE'
Estimated Population
15,000

Estimated Population
150,000

Projected
Population
21,000 by 2014

Population
21, 000 by 2014

GREATER MALE REGION
Migrating Population
GREATER MALE REGION
Migrating Population
MALE'
HULHULE' AIRPORT
VILIMALE'
Estimated Population
8,000

GULHI FALHU
Industrial
THILAFUSHI
Mixed
Development

HULHUMALE'
Estimated Population
15,000

Estimated Population
150,000

Estimated
Inward
Migration
14,000
From the atolls
GREATER MALE REGION
Migrating Population
There is a general lack of land for commercial and institutional use as not all such services can be relocated elsewhere.
Proposed Reclamation :
56,996 sq m
Conceptual design
GRAPHIC VIEW
Conceptual design
GRAPHIC VIEW
Bridge between Villi-Male’ and Male’
Depth Chart
Shallow region
Conceptual design
GRAPHIC VIEW
Conceptual design
GRAPHIC VIEW
Conceptual design
GRAPHIC VIEW
Vili-Male’ Reclamation Project
Proposed Reclamation
22HECTARES

TOTAL AREA (current)
28HECTARES
Total Land Area
after reclamation
50HECTARES
Current Size :
Vili-Male’ Reclamation Project
Conceptual design
GRAPHIC VIEW
Greater Male’ Region Traveling Routes (Marine)
Greater Male’ Region Traveling Routes (Marine)
Inter Atoll Routine
Proposed route (south)
Proposed route (North)
Existing route
Financing of the projects
Financing of the projects
Financing of the projects
Any Questions...?
Greater Male’ Region
Development

Male’ South Reclamation
Vili-Male’ Reclamation Project
Reasons for Relocation
Building fixed link bridge to connect Male’ and Vili-Male’
Proposed Solutions
Insufficient harbor space
Heavy Industrial work
Apartment shortages
Workshops and Storage all over Male’
Expansion of Harbor
Expansion of Villi-Male’
Relocation of workshops and warehouses
Male’ South-West Harbor Expansion
Bridge between Vili-Male’ and Male’
Vili-Male’ Reclamation Project

Of the reclaimable area, 5.69 hectares (600,000 sq. ft.) are proposed to be reclaimed on the southern side.
The reclaimed area is for light industrial usage and warehouses.
Depth survey charts of the surrounding waters of Male’ shows that there are large area’s which can still be reclaimed
A Google aerial view shows that the harbor can be enlarged by repositioning the tripods from its existing locations
To make the community viable, the population has to be increased.
The lagoon in Vili-Male’ has not yet been reclaimed. Large reclaimable areas exist.
Through reclamation, the island will more than double in size.
Reclamation will allow for the building of better housing, and allocation of land for light industries (necessary to provide local employment) recreational areas etc.
A. Deciding on the type of bridges and connection points and design.
B. Feasibility of entire project.
C. Ascertaining a more definitive cost estimates for the projects
D. Ascertaining the best type of shore retention.
E. Feasibility on the enlargement of the Southwest harbor and ascertaining cost.
F. Estimating the project duration.
G. Advising of funding options.
LOAN REPAYMENTS CAN BE MADE THROUGH THE SALE OF LAND WHICH HAS BEEN RECLAIMED.
Estimated amount to build the bridge from Male’ to Vili-Male’ is about USD 80 – 100 Million
Funds have to be found to do both projects as the bridge to Villi-Male’ can be started before the land reclamation is complete. This is due to the fact that the bridge to Hulhule will start on existing land.
MVR 5 million seed money is needed to start the project.