Loading presentation...

Present Remotely

Send the link below via email or IM

Copy

Present to your audience

Start remote presentation

  • Invited audience members will follow you as you navigate and present
  • People invited to a presentation do not need a Prezi account
  • This link expires 10 minutes after you close the presentation
  • A maximum of 30 users can follow your presentation
  • Learn more about this feature in our knowledge base article

Do you really want to delete this prezi?

Neither you, nor the coeditors you shared it with will be able to recover it again.

DeleteCancel

Make your likes visible on Facebook?

Connect your Facebook account to Prezi and let your likes appear on your timeline.
You can change this under Settings & Account at any time.

No, thanks

CAPSTONE PROJECT

No description
by

Jocelyn Guzman

on 24 August 2015

Comments (0)

Please log in to add your comment.

Report abuse

Transcript of CAPSTONE PROJECT

Windows 8 with Service Packets
Norton 365 Security
PBX International
St George Bank Enterprise
PBX VoIP Services and repairs
Windows Servers
Virus Scanning on Domain Controllers
Virus Scanners on Software
Active Directory Security
Secure Administrative Practices
DNS Security
Secure Domain Policy Settings
Hardware
Software
Security
Microsoft Programs and O/S's
Anti-Virus
Workstations
Servers
Mission Statement
JAKE Enterprises will bring you the best technological and diverse infrastructure in today's market. Jake Enterprises strive for excellence; we strive for the best. We promise and guarantee our work and services.
GREENWAY BANK
Dell 9020 Small Form Factor

Intel® Core™ i5-4570 Processor (Quad Core, 3.20GHz

8GB DDR3 SDRAM at 1600MHz

500GB 3.5inch SATA (7.200 RPM) Hard Drive




Intel® Xeon® E5-2643 v2 3.50GHz,
2x 1TB 7.2K RPM SATA 2.5in Hot-
plug Hard Drive

VMware ESXi v5.1U1 Embedded Image on Flash Media

Network Hardware
• 48 Ethernet 10/100/1000 PoE+ ports

• 390W PoE/PoE+ power

• Stack Support
Switches
Cisco Catalyst 3650
Dell PowerEdge C6145

Disaster Recovery Plan,
Gant Chart &
Financial Sheet
Floor Plans
&
Network Layouts

Disaster Recovery Hardware
Timeline
Emergency Personnel Contact
Jocelyn Guzman - 571-490-1793
Allen Jenkins - 310-941-2613
Kevin Baldwin - 323-590-9166
Elbert Jones - 424-215-7865

JAKE Financial Statement
Firewall
Cisco ASA 5520
450 Mbps Throughput
Rack Mounted
8x Gbe Ports
Single internal power supply
APC Symmetra LX 8kVA UPS
Network Printers
Hp LaserJet Enterprise MFP M725z
Functions:
Print, copy, scan, fax
Network Capable
Prints Both Black & Color
Cannon C5255 Image Runner Advance
Color Digital Multifunction Imaging System
Letter: Up to 55/51 ppm
Legal: Up to 28/26 ppm
Ledger: Up to 28/26 ppm
Genmega ATM Machine
GT 3000
Integrated Illuminated Sign
High Visiblility LED Sign
Attract Customers
16-key alphanumeric keypad
PCI/Interac Certified
Triple-DES (TDES) compliant EPP
W.A.P.
(wireless Access Point)

Dual Band
PoE
Remote Management
1Gb Ethernet Port
EnGenius EAP900H
Security System
Focus Digital Network Alarm Video Server EAVS-1204/1208
8 Wired zones, 32 or 56 wireless zones, 4/8 channel video input
8 preset alarm linkage each channel, built-in PTZ controller
8 wired or wireless keypads, 8 remote controller,32 electric appliance control
2 CMS number(Contact ID protocol), 4 private voice number
4 timed auto-arming/disarming
Linkage siren output
Security Camera System Touch-LH16516
16 CHANNELS
16 CAMERAS
1TB HARD DRIVE
700 TVL
130/90FT NIGHT VISION
24" LED MONITOR
INTERNET SETUP WIZARD
Generac 6250 Liquid Propane / Natural Gas Guardian 20kW 120/240V
Uses natural gas for easy and efficient power
Programmable Seven Day Exerciser starts the generator once per week for 12 minutes to prevent oil seal drying and damage between power outages
83.3 Amps @ 240 Volts
Rack Mountable
3 Hour of life
Constantly ready to go
Cisco Video Surveillance 2621V IP Dome - Network camera
Security Surveillance
Tamper/vandal proof
720p
360 degree rotation
PoE
Ethernet Connected
Night Vision
On board Memory
On board battery backup
Total Budget: $540,572.60

Windows 7
Windows Server 2008
AT&T PBX International
St George Banking Enterprises
Office 365

Norton Internet Security
Hardware Budget: $ 107,800.00
Software Budget: $ 72,337.80
Security/Disaster: $ 75,434.80
Labor Cost: $ 210,000.00
Miscellaneous $ 75,000.00
Gantt Chart
Greenway Bank, a new St.Louis company has secured venture capital to take over four failed bank branches in four different cities. Plan is to install state-of-the art hardware and software in the four designated bank branches in the city of New York, Seattle, Orlando, and Los Angeles. The headquarters in St. Louis will house the corporate offices and new inbound customer service call center which needs to be updated with all updated and new equipment.
Full transcript