CONCLUSIONS Previously developed site Recently demolished Lacking ecological features Create ecological features Build high not wide Eco 3: Protection Aim: “To protect existing ecological features from substantial damage during the clearing of the site and the completion of construction works” Aim for: A site with/-out ecological features Will require: Appropriate buffer zones Eco 5: Foot Print Aim for: Maximum occupational area within the footprint of the building Will require: More than one floor / imaginative design Eco 2: Enhancement Aim: “To enhance the ecological value of the site” Aim for: Creation of habitat Exceedance of national legislation Eco 4: Demonstration of Enhancement Aim for: Increase in species diversity/habitat area Development of a ‘fresh’ site Will require: A thorough Phase 1 Habitat Survey Code For Sustainable Homes Eco 1: Ecological Value of Site Aim: “To encourage development on land that already has limited value to wildlife and discourage development of ecological valuable sites” Aim for sites that are: Low ecological value Contaminated Will require: A Phase 1 Habitat Survey Will require: An informed, imaginative ecologist Ecology www.envirocentre.co.uk info@envirocentre.co.uk www.envirocentre.co.uk info@envirocentre.co.uk
More presentations by O Burns
Popular presentations
Academy: 10 ways to say it with prezi
Adam Somlai-Fischer on
Prezi is simple: You Write, Zoom, Arrange.Using these simple means, you can express many things - with great impact.Here are some basic examples such as ...
More popular prezis in Explore>