Deep Space Habitat Concept Demonstrators

Question: Did the project interact with other AES projects? Did the project involve multiple NASA centers?

Answer: Yes.

  • Logistics and Radiation contributed to the layout considerations of the concept.
  • KSC build the Core Module, stair/platforms, and lighting, JPL designed the General Maintenance Work Station, Galley, and Robotics Workstation, LaRC designed and build 80/20 and composite type station rack, GSFC designed the Research Workstations.

Question: Was most of the work performed in-house by civil servants instead of being outsourced to contractors? Did people learn new skills?

Answer: Yes.

  • Majority of the work was performed by civil servants. Only 0.75 WYE was utilized for the build.
  • Lath, Milling machine operations, crane operations and sheet metal working were skill picked up by civil servants this FY. And of course painting.

Question: Did the project incorporate new technologies?

Has the project identified a customer or end user? (ISS, Orion, SLS, JRPA)

Answer: Yes

  • New designed lighting (engineering models of new lights for ISS). New workstation station designs/concepts were implemented. Rack interaction with touchscreens (shows function of racks without expense of build.
  • SLS/MPCV: From the discovered limitations of the Cis-Lunar design a new concept using SLS hardware is being evaluated. I.e. SLS-Derived Habitat (similar to Skylab using Saturn Rocket tank).

Question: Did the project implement innovative approaches to improve affordability?

Answer: Yes.

  • In expensive materials were used in the build of the concept demonstrator for this FY. Use of this material also allowed rapid prototype build techniques. Due to late start of the project and late delivery of the Core Module, these techniques allowed us to meet our milestone.
  • Use of existing hardware kept cost down

Failed Light

Question: Did the project establish partnerships with external organizations or other NASA programs?

Answer: Yes

  • Through KSC, we are utilizing the lights that The Bionetics Corporation built to replace the lights in the Space Station. These light are the engineering versions of the flight hardware. One of the lights failed and we are returning it to Bionetics for them to trouble shoot before the flight models are installed.

Paul S. Bookout, Ph.D.

Project Manager MSFC/Deep Space Habitat,

Concept Demonstrator

paul.bookout@nasa.gov

256.544.1490

Question: Did the project complete its annual milestones?

Answer: Yes.

  • The milestone assigned to MSFC "Integrate mockup ECLSS, power, and avionics subsystems with MPLM-based habitat demonstrator" was completed on 05 September with the Cis-Lunar Concept Demonstrator Review/Evaluation

Question: Did the project engage the public through outreach activities?

Answer: Yes

  • Several interviews were given to the media
  • Gave many tours to the public and ATK Space Flight Awareness award recipients
  • Conducted tour for Astronaut Abbe, a 16 year old girl wanting to be the first person on Mars.
  • Through the XHab Challenge, UAH designed, built and installed a micro gravity stowage system in the 500Day mockup.

FY14 plans.

?

  • DSH is canceled.
  • New project starting, Exploration Augmentation Module.
  • Project has not been defined.
  • Center support level is unknown (FTE & ODC)
  • Other Activities
  • SLS-Derived Habitat Concept Demonstrator
  • FY13 received Technology Excellence funding (performed Trade Study and initial hardware processing)
  • Currently pursuing Center Discretionary Funds to continue into FY14

500 Day

ISS-Derived

Cis-Lunar

ISS-Derived

SLS-Derived

Backup

SLS-Derived Habitat Concept Demonstrator

500 Day Concept Demonstrator

Cis-Lunar Habitat Concept Demonstrator

(tank section, future build)

500 Day Configuration Interior

AES HQ milestone for DSH

Deep Space Module

Additional build to complete the Cis-Lunar configuration

Core Module

Completed with an Eval/Review on 05 Sept

"Integrate mockup ECLSS, power, and avionics subsystems with MPLM-based habitat demonstrator"

AES HQ milestone for DSH

"Integrate mockup ECLSS, power, and avionics subsystems with MPLM-based habitat demonstrator"

Future Bldg 4649 Layout

SLS-Derived

500 Day

ISS-Derived

Cis-Lunar

ISS-Derived

1

Interior View 500 Day Configuration

Interior View 500 Day Configuration