ChemTree Consulting
Potassium Carbonate Production Facility
Equipment Design
Key unit sizing and duty
Process Overview
Product
Handling
Product
Recovery
Impurity
Management
K2CO3 Extraction
Feed Preparation
10A
10B
10D
10C
10E
10
Conclusions
Leaching Ratio
Ash is ~50% insoluble material
Sustainable Development
Key Unit + Rotary Filtration
Project Definition
1.5
0.5
1
2
Water: Ash
Hazards&Controls
% Solids
25%
37%
75%
50%
40%
30%
20%
50%
conc. K2CO3
Dissolving Tank
Power Requirement
Water Jet Exhauster
Dissolving Tank
continued...
Designed Lamella Clarifier
Rotary Drum Vacuum Filter
Advantages of Lamella Clarifier
Lamella Clarifier Mechanism
Major advantage
Solid-liquid Separation Techniques
Lamella clarifier footprint
Cutoff particle size = 100 µm
Removes ~99% of solids from incoming stream
No Chemical Enhanced Primary Treatment
Other advantages:
Conventional clarifier footprint
Cocoa Husk Ash Composition
Features:
Rotary Drum Vacuum Filter
Lamella Clarifier
http://www.youtube.com/watch?v=x74pP2I-EDs
http://www.youtube.com/watch?v=FLmzCkFa9VA#t=39
Process Hazards
Problem Statement
Site Evaluation
Sustainable Development
Client
Economically feasible
Objectives
Constraints
Sustainable project
Environmental
6
Organic Potash Corporation (OPC)
Social
Resource Consumption
Traditional Way of Producing K2CO3
KCl from Mining
Electrolysis to KOH
Crystallize K2CO3
Carbonate with CO2
3A
20
Evaporative Crystallizer
Tema
Ashing Temperature Impacts Colour
3
Takoradi
Every decision counts....
5
4
7
13
Detailed Schematic
ASPEN Simulation
Alternative Evaporator Technologies
Environmental Considerations
Social Impact
Decreased Soil Fertility
Leaching Negatively Impacts Water Quality
Thank you for your attention
Liquid and Gas Effluent Management
Water Infiltration Slows
21
23
Slurry Management
22
26
Constraints
Objectives
Key Unit Process Control
Acknowledgments
Water Use
Energy Consumption
High energy consumption increases operating costs and resource demand. To minimize energy consumption....
Fresh Water
Water Recycle
Purification
Evaporative Crystallizer
Product
Dissolving Tank
Recycle
Water
24B
Effluent
Slurry
24A
Heather Welner & the Staff at OPC
Prof. Noval
Prof. Jia
Prof. Kirk
Lydia Wilkinson
Atif Vaniyambadi
Recovery of Water
What about when the power goes out?
Impurity Management
25
9
8
24C
24
Any Questions?
Froth Floatation Process
Reagents
Froth Flotation vs. Furnace
Full flow pressurization mode dissolved air flotation
Effects of air - solids ratio on float concentration and subnatant suspended solids
14
Capical Cost
Annual Cost
Collector - Oleic Acid
Frother - Caprylic Acid
DAF Operationg Conditions a Performance for Thickening of Biological Settled Sludge (SS)
Introduction
Auxiliary Units
Back-Up Generator
Cooling Tower
Pumps and Pipes
Energy Balances
Fuel consumption for 250 kW Generator
= 68. 14 L/hr
Fuel required in case of power shutdowns:
13
Source: http://www.dieselserviceandsupply.com/Diesel_Fuel_Consumption.aspx
Presentation Overview
ChemTree Consulting
Potassium Carbonate Plant Design
Control and Safety
1. Project Definition
2. Process Design
3. Hazards and Controls
4. Plant Layout
5. Sustainable Development
6. Economics
7. Conclusion
Presenters:
2
1
21
16
20
18
19
Misc.
Bag Slitter Configuration
Product Packaging
Pneumatic Conveying vs. Mechnical Conveying
Material Selection
Anhydrous/sesquihydrous
Concentrated Solution
Step 1: Determine mass flow rate of solid, air and Density of air and Mixture
Step 2: Determine the linear velocity of air at inlet
Step 3: Determine Equivalent length of Elbows
Step 4: Determine the compression Power required
Step 5: Determine the Frictional losses of air that are made by the line, elbows, fittings
Step 6: Determine the Frictional losses of solids
Step 7: Determine total power consumption and Air to Solids Ratio
Economics
ensure cap is secured
double wallpaper with polyethylene moisture barrier
Material of Construction
Plant Layout
Process Design
Revenues
Main Assumptions
Plant Layout
Offices
Plant Layout
Control Room
Process Facility
Raw Material Facility
Sanitary Design
• Inflation rate – 13%
• Minimum Acceptable Rate of Return (MARR) – 20%
• Discount Rate - 25%
• Salvage value is $0
• Depreciation – straight line model used
• Currency in CAD
Gross Revenue = $37.7 M
28
27
17
18
16
15
Total Annual Costs ~ $29.6 M
Total Capital Costs = $26.3 M
10
Economics
Direct Costs
30
Process Flow Diagram
Impurity Management
Labour Costs
Capital Costs
Variable Operating Costs
Fixed Operating Costs
Equipment Costs
Impurities in Solution
31
Calcium &
Magnesium Ion
Sodium Ion
Colloidal Carbon
29
Ferrate
Ferric oxide solid
12A
Froth Flotation
Colloidal Carbon
Sodium & Trace Metals
Purge Stream
Collector
Frother
Froth
Compressed Air
Solution
Clear Solution
Ca & Mg ions
Ferrate
Flotation Tank
Static Mixer
Air Dissolving Tank
K₂CO₃
Cash Flow Analysis
Contingency: $2.5 M
11B
11C
50% potassium carbonate + sodium ions + trace metals
Project Feasibility
K₂CO₃
Ion Exchange
12B
Iron Precipitation
Resin pellets
11D
Cash Flow Analysis Data
Polystyrene
12E
6.5 kg/hour Sodium Sulfite
Hard Solution
Pure Solution
NET PROFIT = $10 M
Sensitivity Analysis Data
Return on Investment
Discounted Payback Period
Net Present Value Calc
Ferric Oxide Solid
Sensitivity Analysis for IRR (in %)
Sensitivity Analysis for Payback Period (in Years)
12C
Net Present Value = $44.3 M
Internal Rate of Return = 53%
Payback Period = 3.6 Years
12
12D
11A
11
Sensitivity Analysis in NPV (in $MCAD)
19
33
32
Back-up Generators
Feed Preparation
Impurity
Management
Product
Handling
K₂CO₃
Extraction
Product
Recovery
Create your own polished presentation in minutes. Just describe what you need.
Free to try, no credit card required