Huron Street Extension

Green Consulting

Thank You for Listening!

Climate/Hydrology

Objectives

Site Description

Topography/Soils

Development

Climate/Hydrology

Recommended Actions

Alignments

BMPs

Implemented

Placement

Summary

HEC-HMS Program

Design Storm

  • 2-year
  • 25-year

Antecedent Moisture Condition (AMC)

  • AMC-I (DRY)
  • AMC-II (NORMAL)
  • AMC-III (WET)

Current/Future Development

Current

(Dry)

Culvert Capacity

(Normal)

Future

(Wet)

  • Acting as the outflow
  • Assumption: Entire flow reaches culvert
  • Dimensions: 6 ft x 12 ft
  • Max Flow = 350 cfs
  • > 235 cfs (25-yr, future development, AMC-III)

Current

(Dry)

(Normal)

Future

(Wet)

Source: Huron Creek Watershed Management Plan

Source: Adapted from GoogleMAPS

Jennifer Bylsma

Jonathan Nelson

Major:

Civil Engineering

Hobbies:

Hiking, Cooking, Crafts

Plans after this:

Actively searching for full time position

Major:

Civil Engineering

Hobbies:

Hiking, skiing, fishing, golfing

Plans after this:

Graduate School (MTU)

Jonathan Nelson

Jennifer Bylsma

Ashley Ziebell

Matthew Wittig

Ashley Ziebell

Matthew Wittig

Major:

Civil Engineering

Hobbies:

Reading, Camping

and Bonfires

Plans after this:

Pursuing Civil

Engineering Position

in Construction Field

Major:

Civil Engineering

Hobbies:

Big Brothers, Big Sisters; Sketching; Guitar

Plans after this:

Begin Environmental Engineering

Position for GM

Objectives

Recommended Actions

Objectives

Site Description

Topography/Soils

Development

Climate/Hydrology

Recommended Actions

Alignments

BMPs

Implemented

Placement

Summary

Environmental Consulting

  • State and Federal regulations
  • Site information
  • Climate/Hydrology
  • Recommended actions

Objectives

  • Minimize impact on:
  • Wildlife/Habitat
  • Land use
  • Water system
  • Three proposed alignments
  • Prevent/preserve existing land
  • Adhere to regulations

Objectives

Site Description

Topography/Soils

Development

Climate/Hydrology

Recommended Actions

Alignments

BMPs

Implemented

Placement

Summary

Summary

Source: Adapted from GoogleMAPS

Objectives

Site Description

Topography/Soils

Development

Climate/Hydrology

Recommended Actions

Alignments

BMPs

Implemented

Placement

Summary

Site Description

Objectives

Site Description

Topography/Soils

Development

Climate/Hydrology

Recommended Actions

Alignments

BMPs

Implemented

Placement

Summary

Topography/Soils

Alignments

BMP Placement

Objectives

Site Description

Topography/Soils

Development

Climate/Hydrology

Recommended Actions

Alignments

BMPs

Implemented

Placement

Summary

N

  • Sub-Watershed Area:
  • 2.1 square miles
  • Region Contains:
  • Wetlands
  • Forest
  • Meadows & fields
  • Industrial development
  • Things to Consider:
  • Wetlands
  • Erosion
  • Water quality

Proposed Alignments

  • Three alignment options
  • Varying topographic and soil compositions

Water Drop Tests

  • Track rainfall water flows
  • Use to place BMPs
  • Identify potential erosion locations

Development Trends

  • Elevation Min: 890 ft
  • Elevation Max: 1065 ft
  • Slope Range: 0% - 8%
  • Soil Composition:
  • Bedrock
  • Muck
  • Loamy/Gravelly Sand

Objectives

Site Description

Topography/Soils

Development

Climate/Hydrology

Recommended Actions

Alignments

BMPs

Implemented

Placement

Summary

Objectives

Site Description

Topography/Soils

Development

Climate/Hydrology

Recommended Actions

Alignments

BMPs

Implemented

Placement

Summary

Wal-Mart

Objectives

Site Description

Topography/Soils

Development

Climate/Hydrology

Recommended Actions

Alignments

BMPs

Implemented

Placement

Summary

Wal-Mart

N

Alignment 2

Alignment 1

Wetland Ponds

N

BMPs Implemented

  • Do not need:
  • Critical Area Stabilization
  • Check Dams
  • Do need:
  • more buffer/filter strips

Wetland Ponds

Alignment 1

Source: Huron Creek Watershed Management Plan

N

M-26

  • Diversions
  • RECPs
  • Watercourse Crossing
  • Riprap
  • Buffer/Filter Strip
  • Silt Fence
  • Equipment Storage and Maintenance

walmart

M-26

Objectives

Site Description

Topography/Soils

Development

Climate/Hydrology

Recommended Actions

Alignments

BMPs

Implemented

Placement

Summary

Copper Country Mall

Alignment 2

Equipment Storage and Maintenance

  • Away from water bodies
  • Runoff can be controlled

Source: www.123rf.com

Superior Road

Silt Fence

Econo

  • Sediment control along downslope surfaces
  • High probability of soil erosion

Source: www.catalogclearance.com

Existing

Control

Source: Adapted from GoogleMAPS

Best Management Practices [BMPs]

RECPs

Source: Huron Creek Watershed Management Plan

Proper

Installation

Source: http://www.michigan.gov/deq/

0,1607,7-135-3313_3682_3714-118554--,00.html

  • Rolled Erosion Control Products
  • Prefabricated blankets/netting

Diversions

Source: Huron Creek Watershed Management Plan

  • temporary channels to

divert water

Source: Huron Creek Watershed Management Plan

  • Goal:

Develop and Construct a Highway Extension from Huron St to Superior Rd

  • Accomplishments:
  • Environmental Site Assessment
  • Proposed Alignments that would achieve Project Goal
  • Guidelines and Practices to follow throughout Project Life
  • Experience:
  • Time Management
  • Teamwork
  • Communication

Check Dam

Source: www.cenews.com

  • Rock barrier
  • Reduce erosion

Buffer/Filter Strip

Source: http://www.michigan.gov/deq/

0,1607,7-135-3313_3682_3714-118554--,00.html

  • Vegetated area next to water
  • Filters out pollutants

www.lakesuperiorstreams.org 

Source:

Watercourse Crossing

  • Culvert
  • Provides safer means of water flow

Riprap

http://mother-natures-backyard.blogspot.com/2013/03/harvesting-rain-rain-gardens-and.html

  • Protect Water Bodies
  • Provide:
  • Erosion Control
  • Pollution Control

Source:

  • Permanent cover of rock
  • Stabilizes bank

Objectives

Site Description

Topography/Soils

Development

Climate/Hydrology

Recommended Actions

Alignments

BMPs

Implemented

Placement

Summary

Source: Chester, Steven E., and Rebecca A. Humphries. "SUSTAINABLE SOIL AND WATER QUALITY PRACTICESON FOREST LAND." Michigan Department of Natural Resources. Michigan Department of Environmental Quality

Photo by: N.i.M.A.